Proyecto centro de datos Towers

Integrating the Construction and Design of an Advanced Data Center with Tier III Certification for Desarrolladora de Zonas Francas

Client: Desarrolladora de Zonas Francas

Integration Details

  • 34.5 KV Electrical Substations
  • Transfer Panels
  • Busbars
  • UPS Systems
  • Chilled Water Cooling
  • Security System

Proyect

Integrating the Construction and Design of an Advanced Data Center with Tier III Certification for Desarrolladora de Zonas Francas

  • Caso Towers


Summary

We designed the building’s technological infrastructure, installing advanced 34.5 KV electrical substations, transfer and distribution panels, busbars and connections, two UPS systems over 500 KW, a data center cooling system with InRoom air conditioning units, a chilled water cooling system with four chillers, video security system, access control, fire detection and suppression systems, and advanced communications and control cabling.